Client: Directorate of Airports of the Ministry of Public Works of Chile (MOP).
Date: 2022-2024
Scope: Define at the detailed engineering level the standardization works required for the movement area, which must comply with national and/or international regulations, including:
- Runway works 09/07 (RESA, turn areas, level strip, fillets in encounters with filming, fence in section versus approach section, among others).
- Design of the extension of the alpha taxiway until it joins the position of the new threshold 27 of the runway.
- Redesign of visual aids and demarcations.
- Drainage system design.
- Studies and simulations.
- Studies of expropriations.
- Social evaluation of the project and environmental studies.
Investment: $426 millones.
Current status: In development.