Expansion and improvement
Client: SACYR Engineering and Infrastructures.
Date: 2019 – 2022
Scope: Development of the Detailed Architecture and Engineering Project for the work of the second concession, which includes:
- Ampliación y Remodelación Edificio Terminal de Pasajeros (11.600 m2).
- Aeronautical facilities (5,700 m2): Administrative building, control tower, SEI, electrical substation, ARO building, Cafeteria, Logistics building, access control.
- Expansion of roads and parking lots.
- Movement area normalization.
- Support Facilities: Electrical substation, drinking water and sewage installation, gas, landscaping, signage, visual aids, among others.
Investment: USD 85 million (works).
Current status: Under construction (2023).